Utility III Details

Shaw Industries Group, Inc. - Dalton, GA

Employment Type : Full-Time

Job Title

Utility III - Shift 2 | 7pm-7am

Position Overview

Essential Duties:

(Considering job knowledge, job environment, effort, manipulative skill, judgment, safety knowledge and responsibility)

  • Wrap finished goods based on specifications on the Production Specification Sheet.

  • Print and apply finished tickets to the outside of the poly wrap on the end of the roll and the duplicate ticket on the side of the roll.

  • Responsible for operating roll-up.

  • Set up slitter knives to desired settings as necessary when required for splitting a roll.

  • Position cores on the roll-up rollers.

  • Initiate the roll-up process at the control panel.

  • Monitor the readout meter for the desired roll length.

  • Cut an edge the width of the material roll and separate the designated roll onto the staging table.

  • Inspect rolls for any wet, wrinkled, or burned spots.

Work Shift

12 Hr non-rotating shift, Hrs fall to in punch day, Observed Calendar, shift starts PM

Shaw is an Equal Opportunity Employer and is committed to providing a workplace free of discrimination, harassment, and retaliation. It is our policy to recruit, hire, train, and promote individuals in all job classifications without regard to race, color, religion, age, sex, sexual orientation, national origin, disability, veteran status, gender identity, or any other legally protected status.

Posted on : 3 years ago